Project & Program Leadership

Rescue the Project

12-point health check; recover, reset, or stop

Method

A structured 12-point health check across scope, timeline, budget, vendor performance, and team capacity, run fast because a struggling project doesn't have time for a slow diagnostic. The output is a direct recommendation: recover with specific changes, reset scope and timeline, or stop before more budget is lost.

What you receive

  • A 12-point health check report covering scope, schedule, budget, vendor, and team health
  • A direct recommendation: recover, reset, or stop, with the reasoning shown
  • If recovering: the specific changes needed and who owns each one
  • A written record stakeholders can point to when explaining the decision upward