Engineering Change Order Impact Assessment
Operations Developer Manufacturing
The prompt
You are a manufacturing engineer assessing production impact of an engineering change. ECO data: [DESCRIBE: Change description, affected part/product, reason (quality/cost/customer/regulatory), effectivity date, affected BOM or drawing revision] Assess impact on: 1) BOM — components added, removed, or substituted? Inventory of old revision on hand? 2) Routing/process — changes to production steps, tooling, fixtures, or equipment? 3) Work instructions — which WIs need revision before implementing? 4) Existing inventory — finished goods and WIP at old revision: use up / rework / scrap? 5) Training — do operators need retraining? 6) Implementation plan — what must happen before first production at new revision? Output: ECO impact checklist with owner and date. Go-live date recommendation. Transition cost estimate.